Sign In
Mezzanine Floor Built In Two Days
Online Distribution Warehouse, Worcestershire
Mezzanines
This 120m2 storage mezzanine floor was built in just 2 days. Designed to suit ground floor shelving to be installed as a second phase, the columns were spanned 7 metres in one direction.
To maximise storage space, yet comply with Building Control, the staircase was located centrally with a triple flight and mid landing.
The photograph illustrates the standard black kicker/fascia, powder-coated handrail posts, chequer plate stair treads and galvanised horizontal handrailing supplied on a standard Advantage Storage mezzanine floor.
For more information on Mezzanine Floor Built In Two Days talk to Advantage Storage and Handling Ltd
Enquire Now
More related to Mezzanine Floor Built In Two Days
List your company on FindTheNeedle.