Sign In
This unit is not supplied with a 5/2 valve, it must be connected to the main valve already on the machine.
The machine operator must simultaneously operate both push buttons.
The safety valve will ignor a single depression.
To repeat the cycle both pilot signals must be exhausted, to allow the next cycle.
By pushing on the push button of the shut off valve, the whole device is deactivated.
Pressure: 2.5 - 8 bar.
Delay between 2 actuating signals: 0.14 s at 3 bar.
The two hand start is sold with C.E certification.
Machinery Directive 2006/42/EC
Norm UNI EN 574-1:2008
EN 574:1996 + A1:2008 type III A.
For more information on A.Z Two Hand Start Device Signal Only c/w Emergency Stop talk to AIRLINK Compressors
Enquire Now
List your company on FindTheNeedle.