Sign In
School Washroom Refurbishment
24-10-2020
Following the specification to replace “like for like” we manufactured 18mm moisture resistant Melamine Faced Chipboard complete with 2mm high impact ABS edging. Using our SOUL cubicle range, ideal for primary school children due to the half height doors and partitions, giving staff members increased supervision of the students without compromising their privacy (for more information on our SOUL cubicle range and all other ranges we have available please visit www.askwashrooms.co.uk/cubicles).
On this project we used Armitage Shanks sanitaryware throughout, predominantly because of the high-quality products but we also like to try and keep all our sanitaryware “uniform” and consistent throughout.
Then for the vanity unit we used an 18mm High Pressure Laminate work top manufactured at 350mm depth, ideal for accepting semi recessed basins. Our removable Access Panels were manufactured from Moisture Resistant Melamine Faced Chipboard (allowing easy access to the concealed pipework to assist staff with maintenance).
For this individual project we were responsible for the rip out of the existing washroom as well as the installation (full carpentry installation and plumbing works) and are pleased to show you the finished product in the images below:
For more information on School Washroom Refurbishment talk to ASK Washrooms Ltd
Enquire Now
List your company on FindTheNeedle.