Modular Hardwall Cleanroom - 4 x 3m
Product Code: CR4 - Optional I&V
ISO 14644-1 Class 7 in Production Area
4 x 3 x 2.425m (2.1m internal height)
1No. HEPA Fan filter unit (FFU)
LED Lighting
3m x 3m Production Area
1m x 3m Change Area
PVC Softwall divide between Production Area and Change Area
Steel swing door entrance
1No. Variable speed controller for HEPA fan filter units
Differential pressure gauge
Low level vent protectors
High level fascia plates
PETg clear hardwall panels to 4No. exterior walls
Modular construction RAL9003
Please note that cleanroom flooring is not included in this cost. We can provide cleanroom flooring additionally on request
Please make arrangements to offload the pallets when received
Validation Only
This cost is based on work being carried out Monday to Friday 9am to 5pm and the validation will be to ISO 14644-1:2015 standard.
The validation will include particle counts to the 'as built' occupancy state and airflow readings, it will be inclusive of an interim and full validation report.
Validation will be subject to our availability and current demand.
Pricing is based on the location being within mainland UK, POA for other areas or if a wider scope of works is required.
Installation & Validation
This cost is based on 2 engineers attending site over 2 consecutive working days, Monday to Friday 9am to 5pm to carry out the installation of the cleanroom and then a validation to ISO 14644-1:2015.
The validation will include particle counts to the 'as built' occupancy state and airflow readings, it will be inclusive of an interim and full validation report.
Installation will be subject to our availability and current demand.
Pricing is based on the location being within mainland UK, POA for other areas or if a wider scope of works is required.
Service Contract
This will provide you with a complete package to maintain and protect your critical processes and investment. This will include an extended warranty for a further 12 month period, 24/7 phone support, a call out support in between service visits and 2 engineer visits to be taken over a 12 month period from the date of installation. Visits will take place within working days, Monday to Friday 9am to 5pm. The interim visit (6 months after install) will include particle counts to ISO 14644-1:2015 standard in the 'at rest' occupancy state, air change rates, airflow readings and filter integrity testing on the annual full visit (12 months after install). Price is inclusive of an interim and full validation report.
Pricing is based on the location being within mainland UK, POA for other areas or if a wider scope of works is required.
Please ensure you are ordering correctly against your specification as these are non-returnable items, unless found faulty on receipt of order.
Please call the team on 01524 813026 for support, bespoke enquiries or any further questions.
For more information on Modular Hardwall Cleanroom - 4 x 3m talk to Cleanroomshop
Enquire Now
List your company on FindTheNeedle.