Sign In
In January LJJ approached roofrunner to provide a solution for supporting AHU units at the lowest possible level upon their building at a brand new Equestrian centre in Lincolnshire. As a result of planning restrictions no roof top units were allowed to be visible from the immediate and surrounding areas of the centre.
ROOF RUNNER SOLUTION
Roofrunner therefore designed a new framework that could locate directly onto the FRF 300 support foot. This allowed the units to be positioned at a maximum height of 100 mm from the roof membrane.As a result all units were cleared by planning and safely installed successfully
For more information on LJJ talk to Roof Runner
Enquire Now
More related to LJJ
List your company on FindTheNeedle.