Sign In
Guardtech Cleanrooms are an industry leader in Clean Room Design as well as Clean Room Construction. Once the cleanroom is built it is delivered direct to your facility; the Guardtech Installation team meet the delivered unit and chronologically unpack and prepare the area. Once all preparation is complete, the installation team use the same method of installation as used on construction, and speedily erect your unit. Once the structure is installed, the unit is sealed, the filtration and temperature levels are achieving specification, and the particle count is satisfactory, then the cleanroom is validated and signed off. We do not leave a job until you are 100% satisfied with the Cleanroom, its functions, and the corresponding equipment. On sign off all documentation will be presented so that a full record is held both with the customer, and an archive held with Guardtech.
For more information on Cleanroom Design, Preparation, Installation & Validation talk to Guardtech Cleanrooms Ltd
Enquire Now
List your company on FindTheNeedle.