Sign In
EDUCATION: Greenwood Academy, Birmingham
22-11-2018
We were delighted to secure another batch of schools under the Priority Schools Building Programme and we were able to provide all elements of the external furniture, cycle shelters and canopies as part of a comprehensive package of products. The products were selected for their excellent performance characteristics and cost effective pricing. With 8 schools in the batch, we were able to assist Carillion, achieve batch wide synergy and keep administration and site liaison to a minimum. Our dedicated Project Team liaising with site all the way through helped us to achieve the multiple deadlines that projects like this require.
**Project Reference: LDINV2103**
Contractor: Carillion
Job Type: Supply and Install
**Products Used:**
2 Sheldon Benches SBN306
1 Sheldon Bench SBN331
14 Malford Litter Containers MLC209
1 Malford Cycle Shelter MCS206-1
1 Malford Cycle Shelter MCS206-2
3 Malford Cycle Racks MCR201-5
3 Malford Cycle Racks MCR200
10 Malford Door Barriers MDB203
2 Malford Bollards MBD203
19 Pewsham Benches PBN406
CASE STUDY LINK TBA
For more information on EDUCATION: Greenwood Academy, Birmingham talk to Langley Design
Enquire Now
List your company on FindTheNeedle.