Mellers Primary School needed a covered walkway canopy to link the older building and newly built building together. Langley Design worked with Wates to come up with a visually appealing solution that was cost effective but large enough to cover the whole desired area. We provided 3 separate canopies at varying sizes that were linked together to create this walkway canopy.
**Project Reference: LDINV2095**
Contractor: Wates Construction Ltd
Job Type: Supply and Install
**Products Used:**
1 Sheldon 7 x 3.5m Canopy SPG320
1 Sheldon 3.5 x 4m Canopy SPG320
1 Sheldon 7 x 2.5m Canopy SPG320