Sign In
We were delighted to secure this bath of schools under the Priority Schools Building Programme and were able to provide all elements of the external furniture, cycle shelters and canopies as part of a comprehensive package of products. The products were selected for their excellent performance characteristics and cost effective pricing. With 8 schools in the batch, we were able to assist Carillion, achieve batch wide synergy and keep administration and site liaison to a minimum. Our dedicated project team liaising with site all the way through helped us to achieve the multiple deadlines that projects like this require.
**Project Reference: LDINV2109**
Contractor: Carillion
Job Type: Supply and Install
**Products Used:**
5 Sheldon Benches SBN331
6 Pewsham Concrete Cubes PBN406
16 Sheldon Picnic Tables SPT315
24 Malford Litter Containers MLC209
2 Malford Cycle Shelters MCS206
12 Malford Cycle Racks MCR200-201
27 Malford Door Barriers MDB203
6 Malford Bollards MBD203
3 Malford Bollards MBD205
CASE STUDY LINK TBA
For more information on EDUCATION: President Kennedy School, Coventry talk to Langley Design
Enquire Now
List your company on FindTheNeedle.