Sign In
We were delighted to secure this batch of schools under the Priority Schools Building Programme and were able to provide all elements of the external furniture, cycle shelters and canopies as part of a comprehensive package of products. The products were selected for their excellent performance characteristics and cost effective pricing. With 12 schools in the batch, we were able to assist Morgan Sindall, achieve batch wide synergy and keep administration and site liaison to a minimum. Our dedicated Project Team liaising with site all the way through allowed us to achieve the multiple deadlines that projects like this require.
Contractor: Morgan Sindall
Job Type: Supply and Install
**Products Used:**
110 Malford Bollards MBD200
16 Malford Bollards MBD201
22 Malford Bollars MBD203
28 Malford Cycle Racks MCR200
43 Malford Cycle Racks MCR201
18 Malford Cycle Shelters MCS206
111 Malford Door Barriers MDB203
6 Malford Motorcycle Stands MMS100
55 Malford Recycling Units MRU201
43 Pewsham Litter Containers
31 Sheldon Benches SBN304
30 Sheldon Benches SBN310
26 Sheldon Benches SBN313
19 Sheldon Benches SBN317
46 Sheldon Benchers SBN318
7 Sheldon Benches SBN331
1 Sheldon Canopy SPG312
16 Sheldon Canopies SPG320
7 Sheldon Canopies SPG326
6 Sheldon Picnic Tables SPT311
12 Sheldon Picnic Tables SPT312
25 Sheldon Planters SPL305
31 Sheldon Seats SST302
22 Sheldon Seats SST303
5 Sheldon Seats SST306
7 Sheldon Storage Sheds SSS301
13 Door Stops
http://langleydesign.co.uk/downloads/case-study/MorganSindallNorthWestBatch.pdf
For more information on EDUCATION: The North West Batch - Priority School Building Programme talk to Langley Design
Enquire Now
List your company on FindTheNeedle.