Sign In
The modern lines of this building required complimentary cycle parking facilities and our MCS204 galvanised and powder coated grey to match the building achieved this. Our Malford fixed and removable bollards with reflective banding helped to provide protection to the building frontage. At the rear of the facility the bin store area was kept neat and tidy with a bespoke Sheldon Bin Store.
**Project Reference: LDINV1724**
Contractor: Interserve Construction
Job Type: Supply and Install
**Products Used:**
4 Malford Cycle Shelter Bays MCS204
9 Malford Cycle Racks
1 Malford Cycle Shelter MCS201
3 Langley Litter Bins LLC104
70 Malford Bollards MBD203
8 Malford Bollards MBD205
http://www.langleydesign.co.uk/downloads/case-study/Interserve-WakefieldDivHQ-LDINV1724-CaseStudy.pdf
For more information on GOVERNMENT: Wakefield Divisional HQ, West Yorkshire talk to Langley Design
Enquire Now
List your company on FindTheNeedle.