Sign In
LEISURE: Waltham Forest Leisure Centre
18-09-2017
Langley Design worked with Wren Construction on this leisure centre upgrade to come up with a cost effective solution. As with most projects of this type the requirement was for tough, robust and fit for purpose materials that fall within the cost plan. Low maintenance products are another major consideration on schemes like this for cash constrained local authorities. The simple galvanised finish on all these steel products not only blends in with the building façade but also means many years of trouble free service life.
**Project Reference: LDINV1968**
Contractor: Wren Construction Ltd
Job Type: Supply and Install
**Products Used:**
2 Malford Cycle Shelters MCS204
8 Malford Cycle Racks MCR201
3 Pewsham Benches PBN405
3 Malford Litter Containers MLC203
http://langleydesign.co.uk/downloads/case-study/WrenConstruction-WalthamForest-LDINV1968-CaseStudy.pdf
For more information on LEISURE: Waltham Forest Leisure Centre talk to Langley Design
Enquire Now
List your company on FindTheNeedle.