Find The Needle Add My Company
Section 104 Sewer Connection Costs
Section 104 Sewer Connection Costs

A Section 104 Agreement (s104) is an agreement entered into by the developer or landowner with the water authority for a sewer connection adopted into the sewer system, if the developer is building a property and wishes to have it connected to the existing sewer system, then they must pay the cost of the connection this is a sum calculated at the cost of connecting the sewer or a formula designated by the relevant water authority that calculates the amount required at technical approval. The option is to pay the water authority the funds or enter a s104 agreement with them underwritten by a Surety

For more information on Section 104 Sewer Connection Costs talk to Nationwide Sureties

Enquire Now

  Please wait...

Location for : Listing Title