NEWBOROUGH PLAY PARK REFURBISHMENT
We have completed the refurbishment of Newborough Play Park, Anglesey in January 2022.
For this refurbishment, we removed and disposed of the old, rotten trim trail and replaced this with a brand new timber adventure trail. We also repaired the timber climbing frame in the centre of the trail – re-treating this with preservative, fixing any broken parts and adding aluminium strimmer protection sleeves at the base of all upright posts.
In addition, we have replaced a broken springer unit with a new version, and removed 2 sets of old metal swings and replaced these with timber versions with added steel feet (to keep the timber out of the ground), as well as re-surfacing around these sets of swings, around the 2 existing metal slides, the existing see-saw, around the new Springer, and around the 3-tower multi-play centre.
Our PlayBond bonded recycled rubber mulch as used as the new surfacing, which was installed over the existing wetpour (to save on the cost of removing and disposing of this) and finished by tucking into the ground at the perimeter edges of all surfacing areas.
For more information on NEWBOROUGH PLAY PARK REFURBISHMENT talk to Playquest Adventure Play Ltd