Sign In
Purging needs an accurate measurement of the volume of the main to be commissioned.
When the new gas main has been pressure tested, certified and connected, the purge point is connected to the extreme of the main. The volume flow meter on the purge kit is reset and the gas is turned on.
For more information on Commissioning Of Mains talk to PW Maintenance
Enquire Now
List your company on FindTheNeedle.