Sign In
CUSTOMER:
Narford Scaffolding Ltd
CONTRACT:
RAF Feltwell
EQUIPMENT:
Tube & Fittings
DESIGN BRIEF:
ACCESS: To provide drawings and calculations for an access scaffold to the cladding above the door, outside of Hanger 5. Bridged over doorways, using nom. 1.8m bays and 2.0m lifts. Loaded to 2.00kN/m² using tube and fittings with aluminium beams.
BIRDCAGE: To provide drawings and calculations for a birdcage scaffold to give access to the underside of the hanger roof. Designed to 1.5kN/m², using tube and fittings with aluminium beams.
For more information on RAF Feltwell talk to Access Design & Safety Ltd
Enquire Now
More related to RAF Feltwell
List your company on FindTheNeedle.