Testbed (Leeds) Halloween Event Production
Halloween 2024 is a busy time of year for production companies and this year we provided full production at Testbed Leeds, Leed's newest large venue.
The system was designed to minimize unwanted reverb and increase intelligibility to sound excellent all the way to the back of the room. We installed the immense Funktion-One Vero VX array cabinets, with their F124 subs, as a time aligned broadside horizontal array.
Two sets of flown delays were Funktion-One's Evolution X loudspeakers, with the rear delays featuring ground stacked F121 subs in a cardioid ground stacked configuration. All powered by Linea Research.
Along the way there were some site design changes which resulted in changes to available locations for speakers and also what structure was usable.
Lots of BeamZ bright beams, LED/Strobe panels and blinders, as well as LED wash lights and a large mirror ball in pride of place giving our lighting engineer plenty to play with.
For more information on Testbed (Leeds) Halloween Event Production talk to Audioserv Ltd