Sign In
Partitioning was installed to create a show room for customers clients, store room, large production room and a office area all with suspended ceilings and LED lighting.
45 lin metres of partitioning with a suspended delinking over each area 4 in total build time 5 days, and all finished in standard grey, customer site was based in Cambridge. Front elevation of the partitioning was all solid glass solid partitioning as well as the internal wall into the office area from the production area, supporting legs for the suspended ceiling had to be installed as it was over the max width of 7m we could span so these 3 legs where located inside the main production area. Customer to wire up the lighting and they will also install air conditioning to keep the areas cool.
For more information on Steel Skin Partitioning Project talk to Billington Safety Systems Ltd
Enquire Now
List your company on FindTheNeedle.