Sign In
Once laid, it can allow footfall within 24 to 48 hours.
Floor finishes can be applied on top of Clockwork Screed’s fast drying screeding with moisture levels as high as 2.5%CM. This is more practical than working with anhydrite screeds that need to have moisture levels of 0.5%CM or less. Reaching such a low moisture level can take anhydrite screeds months to achieve.
For more information on Clockwork Screed’s fast drying screeding is welcomed on construction sites talk to Clockwork Screed Ltd
Enquire Now
List your company on FindTheNeedle.