Sign In
Clip rails are secured easily on to any solid insulation with the use of the barbs and a Poly Membrane supplied, the UF piping is then simply clipped into the rails at the desired spacing. A screed floor of ideally 45-55mm is poured directly onto the pipe to make a solid thermal mass.
For more information on Raufix Rail Systems talk to Go Geothermal Ltd
Enquire Now
List your company on FindTheNeedle.