Houlder was contracted in a turnkey arrangement by MPI Offshore to lead the design, fabrication, installation and commissioning of a pair of hydraulic “gripper” arms. They support pile handling and restraint during installation.
THE PILE HANDLING ARMS ARE INSTALLED ON MPI JACK UP VESSEL TO ACHIEVE THE FOLLOWING:
Aid the installation of piles in up to 40m of water
Handle piles of up to 650T weight
Handle piles of up to 65m length
Handle piles of up to 7m diameter
The 200t pile handling arms, built in to the MPI Discovery stern, provide the horizontal restraint required to handle and restrain piles in the vertical position while they are being driven. When the arms are stowed, they are mechanically and manually “latched” at main deck level, allowing the vessel to safely transit and the hydraulic system to be powered off.
Peter Robinson, Managing Director of MPI Offshore Ltd said, “We are delighted with the final engineered solution created by Houlder Ltd. Both their engineers and ours have worked in collaboration to construct this equipment to exacting standards.
Both arms can be controlled from a single console to be located on the deck. The console is fitted with a 1 X-Y joystick, emergency stop and one touch screen panel for information and mode selection.
Structurally, the pile handling and restraint arms and associated vessel reinforcement are designed against DNV Classification Rules and fully checked using finite element analysis.
Houlder managed the project from initial concept design through to installation and commissioning with the support and involvement of MPIC and MPI Vessel Management.