Sign In
The bridge was build over a water lock to support the building of a fishway on the island in the middle of the Seine. The bridge was used for pipes to transport concrete to the island.
The Bridge was build with a dragline crane on a pontoon, because between the locks their was no space to place a crane. The pillars were 9m high to allow the boots to sail underneath.
For more information on Pipe bridge Amfreville sous les Monts talk to Janson Bridging (UK) Ltd
Enquire Now
More related to Pipe bridge Amfreville sous les Monts
List your company on FindTheNeedle.