In September 09 we took care of a project in Paris on behalf of our client. This task took months of planning. The key requirements involved the installation of three generators to provide power for a high tech strategic Data Centre.
The three generator containers weighed in at 43 tonnes each, before the ancillary components were added, measured 14 metres long X 3.75 metres wide X 3.5 metres tall. The containers were fabricated in Belfast. We visited the manufacturing facility in Belfast to view the containers and components and put together a plan for the assembly operation in Paris. We then visited the Paris site to carry out a comprehensive survey and prepare a schedule for the off loading and assembly of the entire package to include transformers, containers, exhausts, radiators and penthouse boxes. A crane plan was then produced along with a detailed method statement and risk assessment for approval by our client and the main contractor in Paris. The plans were approved without a hitch. A specialist haulage contractor arranged the collection from Belfast and delivery to Paris of all components. We organised mobile cranes with a French supplier to attend the site, our own crew traveled to site with tackle vans loaded with equipment and the entire project was completed ahead of schedule.
For more information on Case study - ST. DENIS, PARIS talk to Lifting Power Limited
Enquire Now
List your company on FindTheNeedle.