Sign In
The Girder Clamp by Lindapter was specified for a platform construction project in North London.
Lindapter fixings were specified for securing steel beams together to form the framework for the new platform at Harringay train station, which is based on the East Coast Main Line. The Girder Clamp was chosen because it allows lateral adjustability during installation, allowing the contractors, AJ services Eng Ltd, to quickly and precisely align the steel sections before tightening with standard hand tools.
For more information on Lindapter Specified for Railway Platform Project talk to Lindapter International
Enquire Now
List your company on FindTheNeedle.