Sign In
"We commissioned Mobility to design, build and then install a powered tracking system after we had had a recommendation to use them from one of our customers. The system had to be robust, as it was to move loads up to 1500 kgs, and it had to be reliable, as we operate 24 hours a day and 7 days per week. After an initial consultation where a design brief was discussed a design and project costing was submitted to me, after submission of an order installation started on site 8 weeks later at the agreed date and time. During the whole process we found the company to be very professional and when on site during the installation, we found that their engineers were very accommodating, working around the ongoing in house processing. I only have good things to say about this company and in my experience with them I would have no hesitation in recommending them."
Mr Ian Griffin (Managing Director)
For more information on WALLWORK HEAT TREATMENT, BURY talk to Mobility Engineering
Enquire Now
More related to WALLWORK HEAT TREATMENT, BURY
List your company on FindTheNeedle.