Sign In
Case Study 2
Project: To offload from others transport a dismantled theatre stage lift, move to inside theatre across timber stage and lower into a 3.5 metre deep pit.
Site: Lincoln School of Performing Arts.
Equipment To be installed: A 3 section hydraulic scissor lift, heaviest item 3000 kgs.
Projector equipment utilised: 2 x 3tonne capacity Lightweight Aluminium gantries and suitable trolleys and chainhoists. PLS special guided skidding track. PLS Nylon rolling systems.
1. Site survey
Prior to commencement of work a full site survey was carried out with the client to determine the method of installation and to highlight any problems or hazards which may require control measures
For more information on Lincoln School of Performing Arts talk to Projector Lifting Service Ltd
Enquire Now
More related to Lincoln School of Performing Arts
List your company on FindTheNeedle.