The recent installation of a Labyrinth Multi–Climber was the second part of a larger installation for the school, the first being a replacement trim trail which was well received by the school.
The latest equipment “The Labyrinth” was for a Key–Stage 2 area to replace a much loved and used trail which had come to the end of its days. The Headteacher, Lisa, considered several options for developing this area and decided on our recommendation which has now been successfully installed.
”“This was the smoothest installation yet and the children absolutely love it. This is by far the most popular equipment ever purchased!
Lisa MeyerHeadteacher