Sign In
An economiser fitted into the exhaust of a Waste Heat Boiler on a gas turbine power generator.
The unit was fitted with an integral flue gas by-pass and preheated boiler feed water in within 10 degrees of saturation temperature at 20 bar.
The by-pass was used to automatically regulate the flow of gases through the economiser and so control the water temperature at all combinations of power/heat.
Case Study 3
Capital Cost £64K
Savings 270KW
Payback 18 Months
For more information on Case Study: BNFL Springfields talk to ThermTech Ltd
Enquire Now
More related to Case Study: BNFL Springfields
List your company on FindTheNeedle.