Heineken has five production locations in Britain with its Manchester Brewery being one of its key facilities.
We were asked by Heineken to design, manufacture and install an economiser for the Royal Brewery in Manchester as part of an overall project to reduce energy consumption and cost.
The unit cools gases from 220°C to 136°C and thereby heats DFW from 80°C to 108°C. Increase in boiler efficiency is 5.1°C giving a reduction in gas cost of over £100,000 per annum.
Case Study 6
Capital Cost £61K
Payback 7 Months