The precision design and manufacture of these tanks were very important as the 3 off 100,000 litre capacity tanks had to be installed after the site had constructed the basement and lower levels of the hospital. The tanks were dropped into the basement and skated into place. Due to site restrictions the turnaround and manufacture on these tanks were crucial to the overall project programme. JA Envirotanks customer liaisons were key to the successful installation of these tanks. Serivces: Design, manufacture and delivery to site Turnaround: 6 weeks plus ongoing due to construction Products Used: • 3 x 100,000 Litre Capacity Single Skin Rectangular Storage Tanks • 2 x 8,000 Litre Capacity Enclosed Bunded day tanks, placed on higher level of structure • 3 x Ladders and platforms

For more information on London Hospital Project talk to JA Envirotanks