Sign In
Mesh partitioning was installed near Swadlincote to secure the edge of a mezzanine floor, preventing objects from falling onto workers below. A sliding door was added to allow for convenient movement of goods as they were completed for customers. The mesh partitioning was installed inside the existing handrail. We now offer a mezzanine floor guard system with integrated handrail and kick plate as an alternative. Handrails and kickplates were customized to fit the partitioning around the floor opening. The partitioning measured 2.4m on two sides and was lower on the third side, and was finished in our standard light grey color with a 50mm x 50mm mesh size. Other colors and mesh sizes are available upon request.
The installation took one day to complete.
For more information on Mesh Partitioning ? Swadlincote talk to Billington Safety Systems Ltd